Preactor on Google+ Preactor on Twitter Preactor on Facebook Preactor on LinkedIn
SIMATIC IT Preactor AS Professional
SIMATIC IT Preactor AS Professional has a number of additional schedule optimization rules to deal with problems such as minimizing changeover times, preferred sequencing and campaigning.  Composite rules can also be built with SIMATIC IT Preactor’s workflow tool. 
At SIMATIC IT Preactor AS Professional level, the user is also able to implement customer specific rules about how materials are consumed and visualize their assembly process from raw materials through to finished goods and sales orders in the Material Explorer. This shows a graphical view of the material dependencies as well as plots of stock levels over time.  The user can see where shortages will occur and choose to keep them as a constraint or ignore them. In addition to this SIMATIC IT Preactor AS professional can model advanced resource constraints, such as rules about concurrent rule usage, and advanced inter-operation constraints including limits on the time between operations and how much operation times can be extended by.

Product Features
  • Multi-constraint scheduling (primary, secondary and materials)
  • Material consumption at order level
  • Static FIFO pegging rule
  • In software table and field renaming
  • In software grid view and dialog design
  • Full PIO functionality
  • PESP with Custom Actions to run external code
  • Mid batch update (display only)
  • Attribute based simple setup times
  • Flexible Order Routing
  • ‘Order at a Time’ scheduling (including weighting rule)
  • 20 re-nameable spare fields for attributes.
  • Multi-constraint scheduling (primary, secondary and materials)
  • Material consumption at order level
  • Static FIFO pegging rule
  • In software table and field renaming
  • In software grid view and dialog design
  • Full PIO functionality
  • PESP with Custom Actions to run external code
  • Mid batch update (display only)
  • Attribute based simple setup times
  • Flexible Order Routing
  • ‘Order at a Time’ scheduling (including weighting rule)
  • Transfer batching and Slack Times
© 2017 Preactor International Limited - A Siemens Company

Tel: +44 (0) 1249 650316 | Sales : sales@preactor.com | Support : support@preactor.com  (Privacy Statement) | (Anti-Corruption Policy)
Preactor International Limited is registered in England and Wales under company registration number 1275683,
with its registered office at Faraday House, Sir William Siemens Square, Frimley, Camberley, Surrey, GU16 8QD, United Kingdom
VAT Number : 601 0365 03