Welcome [Sign In]  |  Register

Current Location: United States
Region:
Country:

Free Scheduling Seminars
Scheduling Seminar
Free half day planning and scheduling seminars are available in the UK. They are run regularly in Huddersfield, Coventry and Chippenham and occasionally at other venues.

Information For:
>> Small Business
>> Multi-plant
>> Potentional Partners
>> Existing Partners

Preactor International is a Microsoft Gold Certified Partner
 
Preactor for QAD, Planning and Scheduling
 
 L_SAGE_100.png
 
Preactor International is a WonderWare Registered ISV
 
On Windows
Product Feature Table
  Feature P100 P200 P300 P400 P500
Automatic resource selection within workcenters
Capable to Promise (CTP) Enquiries from within Preactor
Finite and infinite resources, calendar states, efficiencies and templates
Forward/Backward and bi-directional sequencing by order-attribute
Graphical and textural reports
Import/Export Wizard
License Site Manager
Manual and interactive breakdowns, planned maintenance etc.
Microsoft SQL 2005 Server Express database
Operation & Product Attributes
Operation locking/unlocking by order or operation attribute, resource and time
Parallel operations in process route (assembly & dis-assembly)
Preactor Sequencer
Process run time by part, rate per hour and time per batch
Schedule Statistics
Single resource constraint for an operation
Telephone & E-mail support
Unlimited Data for Number of Operations, resources, products etc
User defineable three color bars
Web Publisher
ActiveX linking for custom event processing
ActiveX links to other software (OCX)
Additional constraints usage by operation and plots
At Risk' Order highlighting and report
Automatic Schedule Repair
Delivery Buffer and 'At Risk' Report
Lot sizing, transfer batching, auto repeat orders and call-off
Operation Hold
Operation Progress
Order Status bar patterns
Plots Window for Secondary Resources
Resource dependant additional constraint usage by resource within a workcenter
Resource dependant process times by resource within a workcenter
Schedule Analysis Window
Sequence dependant changeover time matrices
User configurable real-time messaging system
User configurable SQL 2005 database, menus, and custom routines
Additional Schedule Comparison Tables
Cost calculation by order and entire schedule
Hot Spots Grid Window
Maximum operation span & delay interval to next operation
Mid-batch update and calculations
Multiple constraints for each operation
Operation progress bar color change based on mid-batch update calculation
Preferred resource selection and time-out
Sequential and parallel lots at each stage of process route
Subsequent operation constraints based on current operation
Ability to schedule with or without material constraints
Automatic allocation of materials during download from MRP
Automatic linking of dependent orders (e.g. for assembly)
Material allocation rules linking consuming and producing orders
Material plots
Rule building functions using Visual Basic
Rule building using Event Script Processor (including muti-pass rules)
Sequencing rules that are order, product or resource specific
Sequential and parallel loading of operations from different orders
Shortages report and plot
Standard algorithmic rules, Minimize WIP, Dynamic Bottleneck, Selective Bottleneck (TOC), and Campaigning. Minimize Overall Setup time
Standard dispatching rules e.g. preferred sequence, critical ratio
PBX memory resident BoM Exploder for real-time Visible Order Promising (Run from Preactor)
© 2010 Preactor International Ltd
Tel: +44 (0) 1249 650316 | Sales : sales@preactor.com | Support : support@preactor.com  (Privacy Statement)
Preactor International Limited is a limited company registered in England and Wales under company registration number 1275683,
with its registered office at Cornbrash Park, Bumpers Way, Chippenham, Wiltshire, SN14 6RA
VAT Number : 601 0365 03