Welcome [Sign In]  |  Register

Current Location: United States
Region:
Country:

Free Scheduling Seminars
Scheduling Seminar
Free half day planning and scheduling seminars are available in the UK. They are run regularly in Huddersfield, Coventry and Chippenham and occasionally at other venues.

Information For:
>> Small Business
>> Multi-plant
>> Potentional Partners
>> Existing Partners

Preactor International is a Microsoft Gold Certified Partner
 
Preactor for QAD, Planning and Scheduling
 
 L_SAGE_100.png
 
Preactor International is a WonderWare Registered ISV
 
On Windows
Testimonials
These quotes have been taken from some of the 100 documented case studies prepared in collaboration with Preactor users.

Stuart Bateman , Solent Moulds
The system allows us to provide a due date almost as soon as we receive an order enquiry, if later on in a project, problems occur, things can easily be shuffled around
 
Scott Powell , Wall Colmonoy
“The accuracy of current and projected capacity utilisation provided valuable information for production to feedback to the Sales team. For example, production can now identify a specific window when it knows it can comfortably beat the industry average for a certain product, and for how long. On time delivery performance is up from 80% to 95% while machine utilisation has been increased from 75 to 92%. "
 
Tulio Santos , Sotreq
“Within just a few weeks after going live measurable benefits were achieved. The lead time to assemble final drives for off-roads trucks was reduced from 4 to 3 days without additional hours by better synchronisation of operations. Recently we have used Preactor to decide on a shift change. With the same number of people we have started a second shift which has been able to reduce the lead time further to 2 days, a 50% reduction. In addition Sotreq has heavily reduced overtime, by more than 40%"
 
Patricia Speakman , Ardo
“The system has also brought levels of flexibility that were simply impossible before. We now have the ability to run ‘What If’’ scenarios which are invaluable should we have a problem with a delivery or on a production line. We know instantly the impact of an event on the entire plan and from that use Preactor to judge how best to react.”
 
Steve Speakman , Interface Australia
“We would not have survived without Preactor; we are extremely pleased that we chose Preactor and implemented it with CMS when we did. On top of providing individual schedules / work to lists for every process it is also servicing a number of key areas in our business such as the ability to run order inquiries and get back to customers quickly."
 
Jan Longhorn , Armstrong Flooring
"The benefits of Preactor were immediately noticed, specifically in terms of delivering the much needed visibility that Armstrong required. With the entire current production plan being visible as well as the ability to stretch the future plan out significantly beyond 1 week, Armstrong could identify areas of waste and processes that could be improved. This has directly had led to a reduction in changeover related WIP from 3 days to under 2, a 33% cost saving. “
 
Mr Sachin B L , NTTF
“We have been able to minimize our non value-add processes and can accurately monitor and trace our work in process. We have better control of material movements and this has cut inventory levels. Productivity has substantially improved.”
 
Tony Bestall , Silvergate Plastics
“The benefits were noticeable right away, most noticeably in the area of increased visibility. We can now see all the orders in the system in real time, and how each was progressing. It helped expose the difference between what people thought was required, and what actually was required in order to meet our customer service levels.”
 
Pablo Vega , EDV Packaging
“With Preactor we have got rid of much of the paperwork we had before. Now we have an integrated schedule between the two plants generated using real constraints that we update daily. It allows us to manage everyday alerts, current and future, depending on events in logistic supply chain, as well as the production progress.“
 
Rogério Teodoro , Acelor Mittal
“We have estimated that the additional ladle per day delivered by Preactor, results in an extra US$ 70 million per year on our annual revenue. In addition with the new system of synchronisation the company has obtained a significant improvement due to faster and better decision making on staff allocation and planned maintenance cycles.”
 
Alan Robson , NPIL Pharmaceuticals
“Significant time can be saved by getting a smooth flow of product through each line. As many products have similar packaging requirements, sequencing these correctly minimises the changes to any line which can cut changeover times dramatically. In a similar way, some products do not present a cross contamination risk so it’s important we identify these and factor this in too.”
 
Leszek Kleinert , Vector
“Thanks to implementation of Preactor it has become possible to generate real and feasible production schedules, as well as a substantial time reduction in its preparation. It has enabled a reduction in work in process by about 50% and increased on-time deliveries from 40% to 80%, which helped improve Vector’s competitiveness and strengthened its position in the telecommunications services market."
 
Ian Shufflebotham , Willerby Holiday Homes
“With better schedule accuracy and control of the machining processes, things became much clearer. In the absence of inventory on the shop floor, visibility was created and the number of missing and damaged items dropped to a handful. Bottleneck processes were easily identified by Preactor and contingencies were discussed months in advance.”
 
Michel Nachbart , Procter & Gamble
“Despite the difficulties in the beginning, like the work to improve our SAP data quality, after only 3 months after the system went live, we have realized just how powerful the solution is. The results achieved in such a time were higher than we expected. The APS solution delivered a significant stock reduction of more then 20% on average across all products”.
 
Karl Draper , Foilex
Linked to our ERP Dynamics NAV, the primary objective of reducing tool changes was achieved, and over the first 2 months, was reduced by 20%. This has now extended to a 40-50% reduction which correlates to a rise in production of the same magnitude. To achieve this reduction in tool changeovers, makes Preactor worth every penny in itself. But we have also obtained a number of significant other benefits which add further to the value of our Preactor solution”.
 
Gert Jan Luiten , Holland Colours
“Ross ERP and Preactor have helped Holland Colours to become a more global company. A lot of our procedures can now be, and are synchronised. Our CTP dates are much more accurate due to better planning and scheduling which has a 2-fold benefit. Firstly, we have greater confidence in the accuracy of dates, which fall into 80% of our customers’ acceptable parameters. This ensures we keep these customers happy. "
 
Steven Leese , P P Payne
“Tight integration is saving more than 10 hours a week. Batch cards are now available at the click of a button as the interface uses the Preactor schedule to automatically release and update orders in Fourth Shift. It also allows the CRM functionality of the Fourth Shift system to instantly make available the end times of jobs to customer services, allowing them to deliver more accurate information to end users."
 
Tim Patton , SAM Mouldings
“Preactor has enabled us to push forward with our growth plans, and development of information systems in the factory. We have also been able to schedule our factory for the busiest months in the company’s history, a task which would not have been possible with our old systems.”
 
Conrado Ginel , Talleres Seicon
"Before implementing Preactor we used to have piles of stocks everywhere, but that is radically different now. Our on-time delivery performance is now more than 95% and work in process down by 60%. This has translated into real savings of €80,000 per year while an increase in efficiency of 17% means an additional saving of €40,000 per year. Urgent transport costs that were running at €20,000 are now almost a thing of the past. As the total project cost was in the order of €5,000 this means a quite amazing return on their investment.”
 
David Goyder , GRP Structures
“Preactor has helped drive an entire culture change within GRP. We are now making product more efficiently, have one of the best reputations in the business for reliability and on-time delivery, and have in place the necessary forward visibility for strong and sustained growth.”
 
John Hulme , Destec
“The company is now able to 100% accurate delivery dates to expeditors. Accurate progress reports that drill right down into the progress of each part within a job can be delivered either on request, or pro-actively, all of which provide markedly superior levels of customer service than previously possible.”
 
Cristina Assis , Aquacolor
“The biggest advantage is the ability to be able to forecast the load on each machine, and therefore to predict production lead times and have reliable delivery dates. Now it’s easy to answer our customers when deliveries will be made. It saves 70% of the time previously required to do this. This is important because, before Preactor, we spent 35% of our time searching for answers.”
 
Shaun Naidoo , MIS Engineering
“Preactor gives me the visibility to make accurate delivery promises and meet these in a changing environment”.
 
Eric Kapinos , Oberto
"The immediate benefit was that schedulers were elevated from busy work and data management to 'real production scheduling'. The real payoff was in the 40% reduction of work-in-progress. This is a direct result of the bucketless scheduling available in Preactor, a feature not found in alternative solutions".
 
Jerzy Nagórski , Opolgraf
“Preactor offers unrivalled functionalities, flexibility and user friendly interface while enabling planning capabilities that can handle very complex scheduling tasks. Imagine the complexity of having to schedule 100 book production cycles to be run simultaneously, each being in one of approximately 60 various fabrication phases, taking into account the number of 30 machines used, with up to 30 people per shift, 24 hour, 6 days a week operation!”
 
Dave Poellman , Vesta
“The combination of increased visibility and control would not have been possible and in today’s highly competitive manufacturing market, that’s what you need to keep your existing customers as repeat order customers, while also attracting new customers from your competitors that don’t have it.”
 
Cavin Carver , Blake
“We use Preactor to both make to order and allow us to carry stock on critical lines. As a result of using the Preactor scheduling system our production planning has been reduced from two days a week to half an hour a day. We have also improved next day delivery ability to approx 85% and have also reduced backorders. Before we installed Preactor we were backordering certain items seven or eight times when we were busy. Now it is very unusual to see anything backordered more than twice and when this happens, it is due to a stock error, failed manufacturing plan or failed delivery."
 
Antonio Andrucioli , Klabin Industrial Sacks
"Preactor gave us a fast scheduling response allowing the creation of alternative scenarios which has enabled us to control all stages of the production process - from the customer order by date, through choice of production lines, until the release of the product for the customer."
 
Marcio Schwank , Mega Embalagens
"Mega’s on-time delivery performance is up from 70% to 100% and the production lead-time reduced by 21%. Considerable reduction in work in progress has been achieved through better visibility of future bottlenecks where we could take action in advance”.
 
Jan Longhorn , Armstrong World Industries
"This allows a much more inventive approach to scheduling. Whereas before the key objective was simply to come up with a schedule in time to be issued to the plant floor, now we can ensure we are generating the best possible schedule.”
 
Carl Heller , Cleaveland/Price
“The true value of this system is not in any individual component, but in the complete integration of all systems and processes. The discipline created in the Preactor implementation, eliminates waste, and provides headlights into problems before they effect results. Preactor has assisted us in moving to the next level of our business growth cycle”.
 
Mr. L. R. Chandak , Garware Wall Ropes
“We did a thorough research about the company and their product capabilities. We also spoke to couple of Preactor users before we finally narrowed down to Preactor. A Preactor team from their Bangalore office visited our Wai plant and spent three days understanding the requirements ending up with a prototype. being demonstrated to our team on the final day. This gave us confidence in the flexibility and strength Preactor and the Preactor team”.
 
Leszek Kleinert , Vector
"Preactor has enabled a reduction in process of about 50% and increased on-time deliveries from 40% to 80%, which has helped improve Vector LLC’s competitiveness and strengthen its position in the telecommunications services market. The numbers speak for themselves. I cannot imagine getting such results without having implemented Preactor”.
 
Rhodri John , Wall Colmonoy
“Preactor is having an impact across the entire business. An example of this would be Preactor being able to show us where we might need to invest in a new machine in order to capitalise on a run of a particular type of product. Since Preactor went live it has directly contributed to the decision to successfully invest in 3 different machine centres which in turn has contributed to a significant increase in sales.”
 
Daniel Muir , Highland Spring
“Not only did we now have the means to easily view what was happening at any point in the business and across the entire plan, the information itself was much more accurate. This meant that the production people saw benefits right away because they now had planning information they knew they could trust.”
 
Anusha Amaratunga , DSI, Sri Lanka
“As our planning became more and more difficult to handle manually we were looking for a software solution. We came across Preactor and because they have been into providing Planning and scheduling solutions for many years, we felt that they have good understanding and that’s the reason we decided to go with them.”
 
David Pouliot , Plastique Micron
“The information flow about our orders has significantly improved; It is now accessible at all times to those who need it. Planning is now much more structured and greater efforts are being made to meet customers’ deadlines. PREACTOR has assisted us well in managing our production constraints and conflicts related to equipment capabilities required for production."
 
Petr Vild , Sklostroj Turnov CZ
“Preactor has provided us a tool to work quickly with the capacities of individual resources and also enables us to detect deficiencies in the input data, mainly in the technological procedures and design bills of material,” said Vild to summarize the benefits.
 
Mike Evans , TRP
"We now have to juggle much more detail than we ever had to – smaller orders and with quicker lead times. It’s more vital than ever to know exactly what is happening and when and not rely on approximations. We simply could not have done this before we had Preactor – it’s at the very heart of our production planning and scheduling."
 
Edevaldo de Souza , Medabil
"PREACTOR has a high strategic importance in MEDABIL, combining the company's expertise in the market of building systems with a supply chain that’s increasingly lean, and also sustaining the exponential growth of the company in recent years through an optimized planning solution".
 
Vicente Fadanelli , Flantech
“Preactor is part of a larger context than the mere planning of production in Flantech. The system is part of the strategic objectives for a sustainable growth of our company, and to seek recognition from the market because of our operational excellence. We recommend Preactor to any company that requires intelligent coordination of production processes, regardless of their size or line of activity.”
 
Alex Kämmerer , Cortiaço
“In providing services for cutting, machining and heat treatment, Cortiaço has a high diversity and variability of parts in the production process. We are always looking for new technologies and management tools to exceed our customers’ expectations, and Preactor has provided that. We have experience real results with this solution, benefiting our organization and especially our customers.”
 
Ernani Toso , Grendene
"When we initiated the project with ACCERA, we knew that our biggest challenge would be to shape a tool within our production system and also to address so many features. This was only possible thanks to the speed, expertise in production engineering, and, primarily, the professionalism of ACCERA´s team."
 
Richard Lyon , Global EPP
“When I joined the company, our On Time and In Full delivery rate was 42%, last week it was over 90%. Moreover, we now have complete confidence to give a customer an accurate delivery date and should there be an unforeseen problem, for example a machine breakdown or another issue out of our hands, we can go back and update them right away with an accurate revised date.”
 
Ian Hodgson , Mode Lighting
“Preactor has given us visibility and helped us gain trust and credibility. Preactor has enabled the business to be more integrated and we can confidently make promises and meet them. We pride ourselves on our ability to keep our promises.”
 
Augusto Berdette , Digicon
“With PREACTOR, we anticipate problems and we act quickly, optimizing our production planning in order to meet the complexities of our demand, which is characterized by high mix and small batches. Furthermore, we highlight the power of ACCERA's team in the modeling and deployment of the software."
 
Graziela Aragones , Teikon
"Today, Preactor is an indispensable tool to ensure the maximization of the use of resources and optimization of Teikon processes."
 
Brian Porterfield , EXAL Corporation
“A major plus with the system implemented at EXAL is the confidence we have in the different planning scenarios, we now can look at all our alternatives given bookings and line conditions, and can act with certainty that the solution suggested by Preactor will be realized on the production floor.”
 
Mike Harris , International Greetings
“We have grown from a £20m company to a £70m company, doubling the number of our converting machines and handling more SKUS with much, much larger jobs while reducing our Planning department from 12 to 5. People used to have to manually collate all the work sheets from the production floor and manually update the plan which would take in excess of 2 hours each time this needed to be done. Not only does this now just take 2 clicks of a mouse button, because the information is all stored within the system, it is also always accurate.”
 
Download a free Preactor Tutorial
Latest News
Testimonials
"PREACTOR has a high strategic importance in MEDABIL, combining the company's expertise in the market of building systems with a supply chain that’s increasingly lean, and also sustaining the exponential growth of the company in recent years through an optimized planning solution".
Edevaldo de Souza, Medabil
© 2010 Preactor International Ltd
Tel: +44 (0) 1249 650316 | Sales : sales@preactor.com | Support : support@preactor.com  (Privacy Statement)
Preactor International Limited is a limited company registered in England and Wales under company registration number 1275683,
with its registered office at Cornbrash Park, Bumpers Way, Chippenham, Wiltshire, SN14 6RA
VAT Number : 601 0365 03